C2070-981 Sample Questions & Answers
Free IBM FileNet Content Manager V5.2, Specialist practice questions with worked answers and explanations. See how the ExamJungle simulator prepares you — then jump into the full test.
Launch the full C2070-981 simulator →Showing 6 of 12 free samples.
- Question 1
The system administrator for a large IBM FileNet Content Manager installation is seeing errors in the P8 error log during high volume times. The error is as follows on an IBM WebSphere Application Server V7:
Root Exception message:CORBA NO_RESPONSE 0x4942fb01 Maybe; nested exception is: org.omg.CORBA.NO_RESPONSE: Request 15 timed out vmcid: IBM minor code: B01 completed: Maybe Connection not available while invoking method createOrWaitForConnection for resource [DATASOURCE_NAME]
What can the system administrator do to correct the error?
Show answer & explanation
Correct answer: C
Reference:http://www- 01.ibm.com/support/knowledgecenter/SSNW2F_5.1.0/com.ibm.p8.ce.trouble.doc/p8pct018.htm?la ng=en
- Question 2
During IBM FileNet Content Manager installation, IBM Content Search Services 64bit JVM environment is set with the default max heap size. The administrator needs to increase the indexable document file size from 60MB to 300MB. This requires an increase of the max heap size by updating the IA_MAX_HEAP_SIZE parameter.
Which formula would be used to estimate the heap size?
Show answer & explanation
Correct answer: A
Explanation:
The maxHeapSize parameter sets the maximum heap size for the IBM Content Search Servicesserver. The default is 1.5 GB for 32-bit JVMs and 4 GB for 64-bit JVMs. This value must be a number between 1.5 GB and the maximum amount of memory that is allowed fora specific operating system (64-bit or 32-bit). For example, IBM Content Search Services on a 32-bit Windows system cannot be configured to consume more than 1.8 GB of heap memory. On a 64- bit system, there is no such limit. However, the amount of heap memory that is allocated should take into account the amount of available physical memory. Allocating heap memory beyond the capacity of the computer can have a negative impact on performance and can also result in out-of- memory errors.
You can set themaximum heap size when you install or upgrade IBM Content Search Services by specifying the IA_MAX_HEAP_SIZE parameter in the response file. When you set the maximum heap size to a value greater than 2 GB during the installation or upgrade of IBM Content Search Services on a 64-bit operating system, file size limits for text, XML, and binary documents are increased for new collections. For each 8.3 MB of heap memory over 2 GBs, the values of the file size limits are increased by 1 MB (starting from 60 MB upto 400 MB):
60 MB + (heap memory - 2 GB)/8.3 -- Reference:http://www- 01.ibm.com/support/knowledgecenter/SSNW2F_5.2.1/com.ibm.p8.performance.doc/etspf001.htm - Question 3
Which of the following steps is performed to enable log4j logging in Workplace XT?
Show answer & explanation
Correct answer: D
- Question 4
A company is ready to deploy their custom application, built on top of IBM FileNet P8, into production. The P8 administrator needs to use the FileNet Deployment Manager to accomplish this task. Defining the source environment is one of the first tasks that must be completed.
What three half maps are included in every environment?
Show answer & explanation
Correct answer: D
D
- Question 5
A solution developer for a company has completed the design and initial testing of a custom IBM FileNet P8 application. The next step in the application development projects is to package the solution so it can be moved into QA for further testing. The solution developer will use FileNet Deployment Manager to create a Deploy Package that can be easily handed off to QA.
What are the three main components of a Deploy Package?
Show answer & explanation
Correct answer: D
Reference:http://www- 01.ibm.com/support/knowledgecenter/SSNW2F_5.2.0/com.ibm.p8.common.deploy.doc/overview_i ntro.htm
- Question 6
A solution developer is ready to hand off an IBM FileNet P8 solution to QA for further testing. As part of the error to package the solution for hand off, the solution developer needs to create the security principal half map for the source environment. The Update Principal Half Map dialog box allows the selection of the security principal data source.
One option is the Content Engine LDAP Provider. What is the other option?
Show answer & explanation
Correct answer: A
Reference:http://www- 01.ibm.com/support/knowledgecenter/SSNW2F_5.1.0/com.ibm.p8.common.deploy.doc/deploy_m gr_howto_security_principal_half_map.htm
Ready for the real thing?
The full C2070-981 simulator has every exam-style question, timed mode, and instant scoring.