1Z0-1066-25 Sample Questions

1Z0-1066-25 Sample Questions & Answers

From configuring and running a supply plan, the biggest weight, to preparing the supply network model inputs, demand and backlog management, sales and operations planning, collaborating with suppliers and customers, and automation features.

Launch the full 1Z0-1066-25 simulator →

Showing 10 of 20 free samples.

  1. Question 1Beginner

    Implementing Demand Management · Apply Forecasting Methods, Causal Factors, and then Evaluating Results

    A company wants to improve its demand forecast accuracy by automatically incorporating the impact of external factors like competitor pricing and regional economic indicators. Which Oracle Planning Cloud capability is specifically designed to model the relationship between demand and these types of external variables?

    Show answer & explanation

    Correct answer: B

    Causal Factors are the feature in Demand Management used to model the relationship between demand and external or internal influencing variables (like promotions, price changes, weather, economic data, etc.). The planning engine can then use these factors to generate a more accurate, driver-based forecast.

  2. Question 2Intermediate

    Implementing Supply Planning · Analyze Demand Fulfillment

    After running a constrained supply plan, a planner observes that a high-priority sales order for a key customer is not being fulfilled, while lower-priority demands are. The planner has verified that component inventory is available, resource capacity is sufficient, and the demand priority rules are correctly configured. What is the most likely configuration issue causing the planning engine to ignore the demand priorities?

    Show answer & explanation

    Correct answer: A

    When the 'Enforce Demand Due Dates' option is enabled, the due date becomes a hard constraint. If the planning engine determines it cannot meet the due date for a specific demand (due to lead times, transit times, etc.), it will not schedule that demand at all, regardless of its priority. It will then proceed to fulfill lower-priority demands that it can schedule on time. This is a common cause for high-priority orders appearing to be ignored.

  3. Question 3Beginner

    Preparing and Defining Input Parameters · Explain the impact and attributes of the Supply Network Model

    An implementation consultant needs to define the standard time it takes to ship goods between a central distribution center and a regional warehouse. Which entity within the Supply Network Model is specifically used to configure this transit time information?

    Show answer & explanation

    Correct answer: B

    The Interlocation Shipping Network is the specific component of the supply chain model where transit times, shipping methods, and shipping calendars between source and destination organizations are defined. This information is critical for the planning engine to accurately calculate delivery dates for transfer orders.

  4. Question 4AdvancedSelect 3

    Implementing Demand Management · Understand Demand Plans

    A company is implementing Demand Management and requires a process where the system automatically selects the best statistical model for each item, but also allows planners to easily compare this system-generated forecast with a forecast provided by the sales team to arrive at a consensus. Which THREE configurations are essential to enable this collaborative forecasting process? (Select THREE)

    Show answer & explanation

    Correct answers: A, B, E

    A dedicated, editable measure is required to capture the sales team's forecast as a distinct input into the consensus process.

    A 'Best Fit' forecast profile instructs the planning engine to evaluate multiple statistical methods and automatically select the one with the lowest error for each item, fulfilling the requirement for automated model selection.

    To facilitate comparison and collaboration, the plan layout must be configured to show the different forecast inputs and the final output clearly, allowing planners to see all data points at once.

  5. Question 5Intermediate

    Implementing Sales and Operations Planning · Create and prepare a new Simulation Set

    During an executive S&OP review meeting, a new market opportunity is discussed that would require a 15% increase in production for a specific product family for the next quarter. The executive team wants to immediately understand the potential impact on key resources and profitability before committing. What is the most efficient way for the S&OP planner to model this scenario in real-time within Oracle S&OP Cloud?

    Show answer & explanation

    Correct answer: B

    Simulation sets are designed specifically for this type of real-time 'what-if' analysis. They allow planners to make temporary changes to plan inputs (like demand, capacity, or costs) and see the recalculated impact on outputs (like resource utilization and margins) almost instantly. This allows for rapid scenario modeling during meetings without altering the official baseline plan.

  6. Question 6Intermediate

    Implementing Supply Chain Collaboration · Maintain Vendor Managed Inventory (VMI)

    When a company implements Vendor Managed Inventory (VMI) with a key supplier using Oracle Supply Chain Collaboration, who is typically responsible for creating the replenishment orders in the system?

    Show answer & explanation

    Correct answer: C

    In a VMI relationship within Oracle Cloud, the buyer's planning engine (Supply Planning or Replenishment Planning) is responsible for calculating the replenishment needs based on consumption, forecasts, and agreed-upon inventory levels (min-max). The system then automatically generates the necessary replenishment orders (e.g., purchase requisitions) and communicates them to the supplier, who is responsible for fulfilling them.

  7. Question 7Intermediate

    Using AI/ML/Mobile and Other Automation Features · Identify the business value and capabilities available in AI/ML/Mobile and other automation features

    A supply chain director wants to leverage Oracle Planning Cloud's AI/ML capabilities to proactively identify and prioritize supply chain risks, such as potential late shipments from suppliers or production delays. Which feature directly addresses this need for intelligent risk detection and recommendation?

    Show answer & explanation

    Correct answer: C

    Features like Intelligent Recommendations or Planning Advisor use AI and machine learning to analyze patterns in historical and real-time data. They can predict potential disruptions, such as a purchase order being likely to arrive late, and provide planners with proactive alerts and suggested actions to mitigate the risk. This moves planning from a reactive to a proactive model.

  8. Question 8Intermediate

    Preparing and Defining Input Parameters · Manage sourcing rules/assignments, job roles, and data security

    A company has two manufacturing plants, Plant A and Plant B, that can produce the same finished good. Plant A has lower production costs but limited capacity. The company wants to fulfill demand from Plant A first and only use Plant B for any demand that exceeds Plant A's capacity. Which configuration should be used to model this sourcing logic?

    Show answer & explanation

    Correct answer: B

    Using ranks in a sourcing rule is the correct way to specify priority. By assigning Rank 1 to the preferred source (Plant A) and Rank 2 to the overflow source (Plant B), a constrained plan will first load Plant A up to its capacity limit before assigning any remaining demand to Plant B. This perfectly models the desired overflow logic.

  9. Question 9Intermediate

    Implementing Supply Planning · Identify and Address Exceptions

    A planner is reviewing the output of a supply plan and finds numerous 'Late Replenishment for Sales Order' exceptions. The planner needs to understand the root cause of the lateness for a specific sales order. Which analysis technique should the planner use first to trace the requirement from the sales order down through the supply chain to the constraining component or resource?

    Show answer & explanation

    Correct answer: C

    Pegging is the feature that links demands (like sales orders) to their corresponding supplies (like planned orders, purchase orders, or on-hand inventory). By analyzing the pegging chain for the late sales order, a planner can trace the requirement backward through each level of the bill of material to identify the specific purchase order, transfer order, or manufacturing order that is delayed, thus revealing the root cause of the exception.

  10. Question 10Beginner

    Implementing Sales and Operations Planning · Generate a bill of resources (scheduled process)

    What is the primary purpose of defining a Bill of Resources (BOR) in the context of an S&OP plan?

    Show answer & explanation

    Correct answer: C

    The Bill of Resources (BOR) is a key input for S&OP. It aggregates the detailed routing information from execution systems into a high-level view of how much of each critical resource is consumed per unit of a product family. This allows the S&OP plan to perform rough-cut capacity planning and identify potential resource bottlenecks at an aggregate level.